Trades
One package.
Every trade in it.
The general sends the same 198 pages to the roofer, the electrician, the mechanical sub and the plumber. Bidroq reads it once and hands each trade its own scope sheet, cited to the page.
Live for commercial roofing · Three trades in development

The same set. Six scope sheets.
Ladera Self Storage
121 pages + 77-page exhibit
1 invitation
Roofing · Div 07 50 to 07 70
Electrical · Div 26, 27, 28
In developmentMechanical and HVAC · Div 23, 25
In developmentPlumbing · Div 21, 22
In developmentGlazing · Div 08 40 to 08 90
PlannedDrywall and framing · Div 09 20 to 09 50
PlannedFour things the roofer already trusts.
The read
Drawings, specs and addenda, front to back, the day they land. Addenda attach and strike.
The citation
Section and page under every line. Not stated where the documents are silent. Conflict where they disagree.
The memory
Every invitation your office ever received, askable. Every manufacturer sheet. Every decision.
Bob
Drafts the RFI from your own mailbox. Recommends bid or pass on your rules. A person clicks Send.
What a trade template holds.
| What | Roofing today |
|---|---|
| Division map | 07 20, 07 50 to 07 70, plus 01 33 submittals and the A-500 sheet series |
| Recurring questions | Assembly, attachment, insulation R-value, warranty type and term, edge metal, drainage count, code items |
| Conflict rules | Summary versus assembly detail; keynote versus schedule; addendum versus base spec |
| Manufacturer library | Elevate live: data sheets, design guides, warranties |
| Takeoff path (second tier) | Automated Bluebeam takeoff into your Excel template |
Electrical, mechanical and plumbing each get their own five rows. The read engine underneath does not change.
The second tier is built per trade. It ships for a trade after the read does, not with it.
Where each trade stands.
Commercial roofing
LiveDeployed with a $15M roofer in Colorado.
Electrical
In developmentPanel schedules, one-lines and lighting schedules, cited.
Founding desks · 5 open
Mechanical and HVAC
In developmentEquipment schedules and sequences, cross-checked to the spec.
Founding desks · 5 open
Plumbing
In developmentFixture schedules, risers and the code items hiding in Division 01.
Founding desks · 5 open
PlannedWaterproofing and envelope·Glazing and curtain wall·Drywall, framing and acoustical·Painting and coatings·Flooring·Concrete and masonry·Structural and miscellaneous steel·Fire protection·Earthwork and site utilities·Elevators and conveying·Low voltage and security
Not listed? The founding desk form takes any trade.
Founding desks
Five desks per trade. The same deal our first roofer got.
Questions from other trades.
Is the electrical read as good as the roofing read?
Not yet. Roofing has a year of real packages behind its template. Electrical starts with the same engine and an empty template. Founding desks are how it gets filled.
Can my roofing account add waterproofing?
That is the closest trade to roofing and many roofers carry it. Tell us on the founding desk form and we will say whether it is a template extension or a new trade for your office.
Does the second tier come with each trade?
No. Markup to filled estimate is built per trade, after the read for that trade is live. It is in beta for roofing today.
What if my trade is not listed?
Reserve a founding desk and pick Other. Every trade in a commercial package is a scope filter on the same documents.
When?
When a founding desk has run real invitations through it and checked the read against the set. We do not put dates on a page.
Send us your ugliest bid package. Any trade.
- Roofing figures from the Colorado design partner tenant, September 2026. No figures are stated for any other trade.
