Trades

One package.
Every trade in it.

The general sends the same 198 pages to the roofer, the electrician, the mechanical sub and the plumber. Bidroq reads it once and hands each trade its own scope sheet, cited to the page.

Live for commercial roofing · Three trades in development

Bid set open beside the spec binder on an estimating table

The same set. Six scope sheets.

Ladera Self Storage 121 pages + 77-page exhibit 1 invitation Roofing Div 07 50 to 07 70 Live Electrical Div 26, 27, 28 In development Mechanical and HVAC Div 23, 25 In development Plumbing Div 21, 22 In development Glazing Div 08 40 to 08 90 Planned Drywall and framing Div 09 20 to 09 50 Planned Roofing scope sheet 60 mil TPO mechanically attached, R-40 07 54 23 · p.418 20-year NDL warranty required 07 54 23 · p.436 Fully adhered in summary, mechanically attached in details Conflict Live In development Planned

Ladera Self Storage

121 pages + 77-page exhibit

1 invitation

Roofing · Div 07 50 to 07 70

60 mil TPO mechanically attached, R-4007 54 23 · p.418
20-year NDL warranty required07 54 23 · p.436
Fully adhered in summary, mechanically attached in detailsConflict

Electrical · Div 26, 27, 28

In development

Mechanical and HVAC · Div 23, 25

In development

Plumbing · Div 21, 22

In development

Glazing · Div 08 40 to 08 90

Planned

Drywall and framing · Div 09 20 to 09 50

Planned

Four things the roofer already trusts.

The read

Drawings, specs and addenda, front to back, the day they land. Addenda attach and strike.

The citation

Section and page under every line. Not stated where the documents are silent. Conflict where they disagree.

The memory

Every invitation your office ever received, askable. Every manufacturer sheet. Every decision.

Bob

Drafts the RFI from your own mailbox. Recommends bid or pass on your rules. A person clicks Send.

What a trade template holds.

WhatRoofing today
Division map07 20, 07 50 to 07 70, plus 01 33 submittals and the A-500 sheet series
Recurring questionsAssembly, attachment, insulation R-value, warranty type and term, edge metal, drainage count, code items
Conflict rulesSummary versus assembly detail; keynote versus schedule; addendum versus base spec
Manufacturer libraryElevate live: data sheets, design guides, warranties
Takeoff path (second tier)Automated Bluebeam takeoff into your Excel template

Electrical, mechanical and plumbing each get their own five rows. The read engine underneath does not change.

The second tier is built per trade. It ships for a trade after the read does, not with it.

Where each trade stands.

Commercial roofing

Live

Deployed with a $15M roofer in Colorado.

Div 07 20, 07 50 to 07 70
Conflict pattern: summary versus assembly detail
Elevate library live

See the read

Electrical

In development

Panel schedules, one-lines and lighting schedules, cited.

Div 26, 27, 28
Conflict pattern: panel schedule versus one-line versus keynote
Library: switchgear, lighting, fire alarm

Founding desks · 5 open

Mechanical and HVAC

In development

Equipment schedules and sequences, cross-checked to the spec.

Div 23, 25
Conflict pattern: equipment schedule versus spec versus drawing tag
Library: rooftop units, VRF, controls

Founding desks · 5 open

Plumbing

In development

Fixture schedules, risers and the code items hiding in Division 01.

Div 21, 22
Conflict pattern: fixture schedule versus riser versus civil sheet
Library: fixtures, water heaters, backflow

Founding desks · 5 open

PlannedWaterproofing and envelope·Glazing and curtain wall·Drywall, framing and acoustical·Painting and coatings·Flooring·Concrete and masonry·Structural and miscellaneous steel·Fire protection·Earthwork and site utilities·Elevators and conveying·Low voltage and security

Not listed? The founding desk form takes any trade.

Founding desks

Five desks per trade. The same deal our first roofer got.

Free while your trade's read is built. Discounted for life when it ships.
Your real invitations shape the template. You see every read first.
No card, no contract, leave by email.
In return: real packages, honest feedback, and a case study when you are happy with it.

Reserve a founding desk

Where your invitations come from

Five per trade · Reviewed by a person · No card

Questions from other trades.

Is the electrical read as good as the roofing read?

Not yet. Roofing has a year of real packages behind its template. Electrical starts with the same engine and an empty template. Founding desks are how it gets filled.

Can my roofing account add waterproofing?

That is the closest trade to roofing and many roofers carry it. Tell us on the founding desk form and we will say whether it is a template extension or a new trade for your office.

Does the second tier come with each trade?

No. Markup to filled estimate is built per trade, after the read for that trade is live. It is in beta for roofing today.

What if my trade is not listed?

Reserve a founding desk and pick Other. Every trade in a commercial package is a scope filter on the same documents.

When?

When a founding desk has run real invitations through it and checked the read against the set. We do not put dates on a page.

Send us your ugliest bid package. Any trade.

Six hundred pages of specs and three hundred sheets. We will tell you what your trade is on the hook for, cited to the page, and how far along your trade's read is.
No card. If it is not useful, you have lost an email.
Reserve a founding desk
  1. Roofing figures from the Colorado design partner tenant, September 2026. No figures are stated for any other trade.